Construction of small
hydro and solar power plants
in Bosnia and Herzegovina.

___________

Eco Energy Ltd.

The inexhaustible power of the sun and water enables the production of renewable energy, thus providing savings, independence and a clean environment.

The company “Eco energy” Ltd. Gračanica was founded in 2005, and its main activity is the production of electricity, as well as providing consultancy and engineering services.
The head office is in Gračanica and so far the company has built one small hydroelectric plant “Osanica 4” located in the municipality of Goražde. It is connected to the electricity network.

Based on its characteristics, the small hydropower plant “Osanica 4” is the most profitable power plant on the Osanica River. The company “Eco Energy” has won a concession to build it and it has developed the project documentation.
With land of about 42,000 meters owned by our company and located in the sunniest part of Bosnia and Herzegovina in the Municipality of Stolac, we have the potential to build 12 solar power plants with individual installed power of 150 kWh, of which the first four solar power plants have already been built and connected to network.

Eco Energy

In the coming period, the plan of the company is to continue the construction of small hydro and solar power plants in Bosnia and Herzegovina.

Solar power plants

Our main goal is to use the potential of solar energy in solar panels. Solar energy is safe, clean, and renewable energy source, which will undoubtedly play an important role in power supplying in the future.

Hydropower plant

Reflecting the saying “Let us use the power of water,” the small hydropower plant “Osanica 4” is according to its characteristics the most profitable power plant on the Osanica River. The company “Eco Energy” had won the concession to build it.

Certificate

ECO ENERGY Ltd. Gračanica is certified:
Quality Management System ISO 9001: 2008 in the scope of activities of electricity production.

News

  • August, 2019
    Construction of solar power plants in the Municipality of Stolac
    The first four solar power plants of 150 kW installed have been built for which we have all the necessary permits and they are connected to the electricity grid with the consent of the competent Electric Power Company. The investment in the construction of the remaining eight solar power plants is planned, while the dynamics of construction will depend on the possibility of connection to the electricity grid.
  • July, 2016
    The Construction of Solar Power Plants in Stolac
    Two solar powerplants of installed capacity of 150 kWh  have been constructed at the site Hodovo – municipality Stolac and conditions for connection have been provided.Requests forconnection to the electricity network have been submitted to the competentElectric power company.
    The Company Eco Energyhave bought the land in order to construct additional six solar power plants ofindividual power of 150 kWh with all elaborations, projects and building permits.
  • May, 2014
    ISO 9001: 2008 Certificate for the Production of Electricity
    The company ECO ENERGY Ltd. Gračanica was awarded a certificate confirming that its Quality Management System regarding the activities of electricity production complies with the requirements of ISO 9001: 2008.
  • March, 2014
    The Construction of Solar Power Plants in Stolac
    The construction project of the Solar Photovoltaic Power Plant in Hodovo (Stolac municipality) was registered in the book of projects under construction “RESC” (Renewable Energy Sources and Efficient Cogeneration) at the Federal Ministry of Energy, Mining, and Industry.
    The representatives of Eco Energy Ltd. had participated in a workshop on “Project Preparation for Participation in Sarajevo Business Forum 2014” with the aim of the most efficient presentation of the project of construction of the Solar Photovoltaic Power Plant to potential investors at the forum which was held on 14 and 15 May 2014 under the auspices of BBI Business Club.
  • June, 2013
    The Construction of Solar Power Plants in Stolac
    By purchasing the land in Hodovo, in the municipality of Stolac, the company Eco Energy Ltd. Gračanica secured the basic preconditions for the collection of all the necessary permits for the construction of the Solar Photovoltaic Power Plant.
  • December, 2012
    The Construction of Solar Power Plants in Stolac
    Eco Energy Ltd. launched an initiative to obtain the land as well as the approval for the construction of two solar power plants of 150kW each in Stolac.

The use of renewable energy, the engagement of smaller funds, short construction periods, the minimum costs of maintenance and preservation of a healthy environment are nowadays the reasons for the construction of small hydro and solar power plants in the developed countries of the world.